Methanol output
2,000 tpa
Electrolyser
6.0 MW
PV array
15 MW
Unit scale
10-20 MW
Irradiation
~1,800 kWh/kWp
Grid connection
None required
Technology
Off-grid photovoltaics (15 MW), battery (7.5 MWh), electrolysis (6.0 MW), Direct Air Capture (3,200 tpa CO₂) and methanol synthesis (2,000 tpa) integrated in one standardised unit.
Timeline and offtake
Construction targeted 2027-2028; commissioning and first methanol targeted Q1 2029. Phase 1 output is intended for distributors and blend-in buyers while institutional offtake is negotiated against pooled Phase 2 and 3 volume.
FOAK Andalusia
In development
Near Seville, Spain · First-of-a-Kind · Phase 1
Overview
The FOAK (First-of-a-Kind) Andalusia project is Greenberg Energy’s demonstration unit, integrating five proven components into a standardised modular e-methanol production system.
Technical Specifications
Methanol output
2,000 tpa
Solar PV
15 MW
Battery
7.5 MWh
Electrolyser
6.0 MW
Direct Air Capture
3,200 tpa CO₂
Unit scale
10-20 MW
Irradiation
~1,800 kWh/kWp
Grid connection
None required