FOAK Andalusia - First-of-a-Kind Unit
First-of-a-kind demonstration unit near Seville, Andalusia, Spain. Standardised modular e-methanol unit with 2,000 tpa methanol output.
FOAK Andalusia
In developmentNear Seville, Spain · First-of-a-Kind · Phase 1
Overview
The FOAK (First-of-a-Kind) Andalusia project is Greenberg Energy’s demonstration unit, integrating five proven components into a standardised modular e-methanol production system.
Technical Specifications
Technology
Off-grid photovoltaics (15 MW), battery (7.5 MWh), electrolysis (6.0 MW), Direct Air Capture (3,200 tpa CO₂) and methanol synthesis (2,000 tpa) integrated in one standardised unit. The holistic energy management system (AI-optimised asset control) is the proprietary IP layer that enables off-grid operation.
Timeline
- Feasibility: Q3-Q4 2026
- Site selection: Q3-Q4 2026
- Capital raise / Permitting / Supplier contracts: Q1-Q2 2027
- Construction: Q3 2027 - Q4 2028
- Commissioning and First Methanol: Q1 2029
Offtakers
Phase 1 output is intended for distributors, blenders and small industrial buyers who can absorb single-module volume without an institutional contract.
Strategic Context
The FOAK unit serves as the proof-of-concept for Greenberg’s modular approach. Success here validates the factory-built model and enables scaling to Phase 2 (4 units) and Phase 3 (16 units).
Site Advantages
- Proximity to existing hydrogen infrastructure (Aljarafe H₂ storage)
- Access to convertible gas pipeline within 6-8 km
- Connection to European Hydrogen Backbone
- High solar irradiation (~1,800 kWh/kWp) supporting off-grid operation
All dates are planning targets, not commitments.